Details and Painting

Now that all of our walls are up and most of the messy work is done, we’re finally able to install some of the fixtures and finishes (windows, doors, trim, etc.).  Also we’ve been able to spend a good deal of time putting primer and paint on the walls…but there’s still lots more to do.  Here’s a few pics of the latest progress…

The tasting bar with primed walls.

The tasting bar with primed walls.

The window and doors into the brewhouse are installed.

The window and doors into the brewhouse are installed.

Hallway to bathrooms, primed and ready for paint.

Hallway to bathrooms, primed and ready for paint.

Women's bathroom, painted and ready for tile.

Women's bathroom, painted and ready for tile.

The warehouse, painted and with doors.

The warehouse, painted and with doors.

Warehouse wall, with FRP.  Sinks for the brewhouse will be mounted here soon.

Warehouse wall, with FRP. Sinks for the brewhouse will be mounted here soon.

Brewhouse doorways.  Fire-shutter is over the window (center); Air Curtain is over the loading-area door (left).

Brewhouse doorways. Fire-shutter is over the window (center); Air Curtain is over the loading-area door (left).

A corner of the brewhouse, painted and tiled, and ready for the floor to be sealed.

A corner of the brewhouse, painted and tiled, and ready for the floor to be sealed.

The loading area, primed and ready to be painted.

The loading area, primed and ready to be painted.

Advertisements

3 thoughts on “Details and Painting

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s